Project Owner
City of Sacramento
Project Location
Sacramento, California
Project Value
$0.2m
Project Description
Planned and managed modifications to the Sacramento Light Rail Overhead Catenary System (OCS) to safely allow construction of a precast cored slab bridge structure across the Sacramento Light Rail Station. Scope of work included engineering support, material procurement, equipment, construction supervision and testing. DMZ also helped re-design and procure new OCS drop tube mounting devices when the contract design would not work as expected.