Project Owner
Port of Oakland
Project Location
Oakland, California
Project Value
$2.4m
Project Description
Installed 8,000 linear feet of 10” and 6” diameter PVC pipeline with 17 new hydrants and 2 backflow preventers to replace the existing firewater system. Work also included erecting 2 new high mast LED lights and foundations and removing the existing light poles. All work was performed within an active port facility.